How to Unite Architects & Builders
"Architects design things we can't actually build."
Every builder has said this at least once, usually while staring at plans that ignore practical realities. We sat down with Saxon Hall, Principal Architect at Align Architecture, to understand why architects and builders struggle to communicate - and more importantly, how Saxon's background as a carpenter's son helps him bridge this gap.
Saxon isn't your typical architect. Growing an architectural practice in Tasmania, his upbringing as a carpenter's son shaped his approach to design. This background gives him insight into both sides of the architect-builder divide, understanding the frustrations each experiences while recognising the value of early collaboration.
His diverse portfolio spans residential, multi-residential, tourism, educational, public, master planning, and heritage projects. Saxon thrives on problem-solving scenarios, generating architectural solutions adapted for Australia's climate, landscape, and place. With a strong interest in energy-efficient, environmentally sustainable design, he focuses on providing clients with architectural solutions that suit their lifestyle - not just impressive drawings that prove impractical to build.
Architects vs Builders
The architect-builder dynamic can be tense, and Saxon understands why. Having witnessed his father's builder perspective while pursuing architecture himself, he sees the inherent problems in traditional workflows where builders enter projects after major design decisions are locked in.
Saxon's solution? "Bringing builders onboard from day one can save a lot of heartache down the track." This isn't just theory - his practice actively implements this philosophy through their approach to project collaboration.
The Project Lifecycle: Builders in the Room Early
Saxon's practice adopts the 'Align Build Collaboration' method, fostering early builder involvement. This approach ensures everyone understands project goals, constraints, and possibilities from the start, leading to smoother execution and fewer surprises.
Early builder engagement allows practical construction knowledge to inform design decisions while they're still flexible and affordable to adjust. This prevents the common scenario where beautiful designs prove impractical or prohibitively expensive to build. Saxon's experience across diverse project types - from heritage work to energy-efficient new builds - demonstrates how early collaboration improves outcomes regardless of project complexity.
Tender Processes: To Negotiate or Not to Negotiate?
We explored tender processes, comparing traditional competitive tendering with negotiated contracts. Saxon shared his perspective on why some architects and builders resist negotiation, while we discussed the potential benefits of cost transparency early in projects.
This debate revealed the different stakes and risks each party faces. Architects want design integrity protected, while builders need financial viability. Finding processes that serve both interests requires trust and open communication that traditional adversarial approaches don't foster.
Design, Passive Houses, and the Poetic Nature of Architecture
Saxon's philosophy extends beyond collaboration mechanics into architecture's deeper purpose. He believes in the "poetic nature of architecture" - the blend of creativity and functional design that transforms structures into homes. His commitment to energy-efficient, environmentally sustainable design proves that sustainability and aesthetics can coexist successfully.
This perspective matters because it shifts focus from architecture as purely technical exercise to architecture as craft that enhances how people experience their environments. Saxon's climate-adapted, place-responsive designs demonstrate that when builders understand this vision, they become partners in creating something meaningful rather than just executing instructions.
The Fun Hat vs The Contract Hat
Saxon, like many of us, knows when to be serious and when to ease off. Effective collaboration requires understanding when to have fun and when to put 'the contract hat' firmly on. This balance maintains both professional standards and positive working relationships.
The ability to switch between these modes - collaborative and contractual - prevents relationships from becoming either too casual (where standards slip) or too rigid (where creativity suffers). Finding this balance is essential for long-term successful partnerships.
Our chat with Saxon reinforced the need for effective communication and mutual respect between architects and builders. His innovative approaches at Align Architecture demonstrate how breaking down communication barriers transforms projects from battlegrounds into collaborative successes.
The architect-builder divide isn't inevitable - it's a product of traditional workflows that separate design from construction reality. Saxon's background and approach show that when architects understand building practicalities and builders appreciate design intent, both parties deliver better outcomes.
For builders frustrated with impractical designs, the solution isn't complaining after the fact, it's insisting on early involvement in projects. For architects wanting their visions realised properly, the answer is engaging builders as collaborators rather than treating them as mere executors.
LINKS:
Align Architecture: https://align.build/
Connect with us on Instagram: @themindfulbuilderpod
Connect with Hamish:
Instagram: @sanctumhomes
Website: www.yoursanctum.com.au/
Connect with Matt:
Instagram: @carlandconstructions
Website: www.carlandconstructions.com/
-
[00:00:00] Hamish: as Matt said, I've got my sexy voice on today just for you.
[00:00:03] Saxon: how do you activate that?
[00:00:04] Matthew: is how he actually always talks to me on the phone. By the way, he always puts this on
[00:00:09] Hamish: this sexy voice is care of my four month old who came home from Canberra with a cold. And I thought I dodged it. Um, but apparently not. Here I am.
[00:00:19] today we are joined by Saxon Hall, who is the leading architect
[00:00:26] Saxon: Yeah. Lead, architect, principal, architect, whatever title you wanna gimme. Really?
[00:00:29] Matthew: Precious.
[00:00:31] Hamish: at, at Matthew.
[00:00:35] Matthew: get Hamish going.
[00:00:37] Hamish: so I'm gonna excuse my friend, Matthew Saxon. He, um, he likes to poke the bear whenever he's talking about architects and I don't agree with him.
[00:00:47] Saxon: we'll see if we can enlighten him,
[00:00:48] Matthew: Well, I actually want to get to the first, so I read your form and I want to get to the point because the way you explained what an architect should know about a builder and what a builder should know about an [00:01:00] architect is perfect.
[00:01:01] Saxon: I can't even quite remember the questionnaire that I actually submitted, so
[00:01:04] Hamish: Well,
[00:01:05] Matthew: Your memory, it's the builders are always right.
[00:01:09] Hamish: Hey guys. Axon, why don't you start off by, uh, introducing yourself to the audience.
[00:01:13] Saxon: my name's, uh, Saxon Hall. I'm located in, um, yeah, Hobart Tasmania. I lead an architectural practice down here called, um, a Align architecture, um, a few years old. And, um, yeah, we service the whole, the whole state of Tasmania and, uh, starting to double in.
[00:01:31] Some New South Wales and Victorian, um, clients as well. So that's, uh, me and yeah, this is, look, this is my first, this is my first rodeo, first, first ever podcast. So, hopefully you've had a, you've got a good producer who can, uh, do some good editing skills and as IFU way through it.
[00:01:47] Matthew: We don't edit any. We don't edit anything. We want it be natural.
[00:01:51] Hamish: Absolutely.
[00:01:52] Matthew: you've got some cool project locations. You talk about Tazzie, you're building or you've designed a house on an island off an island.
[00:01:59] Saxon: [00:02:00] yeah, we've got a, we've got a project under construction at the moment, um, uh, with the Zeno builders, um, on the east coast of Tasmania. yeah, it's called Picnic Island.
[00:02:09] Um, it's located in the Reay area and it's a. 40 square meter micro build, um, in an extremely remote, remote location. Um, we've got helicopters involved and, and all those nitty gritty things to try and get a building built in the middle of nowhere. And, uh, yeah, you can sort of, it's pretty unique.
[00:02:27] Um, very, had to adapt very quickly to doing a construction project on, on a small little island. But yeah, you can find it online and um, and have a squeeze. It's pretty interesting.
[00:02:37] Hamish: I've. Following that one, um, pretty closely. And, and I don't know, you know, where, whether Carl was just more excited about the potential, like social media, like potential for this project or, you know, he actually was like in, with the actual build, but the stuff that him and Matt longer been doing, um, with the helicopters and stuff like that.
[00:02:58] It's been pretty epic. Like I've
[00:02:59] Matthew: I [00:03:00] thought it was Kyle just being Kyle, just getting a helicopter for the fun of it.
[00:03:03] Hamish: No,
[00:03:04] Saxon: The first discussions around the helicopter situation was like, okay, who's jumping out this thing into the water? They were pitching stuff like swimming to shore, like with the architectural plans and all kinds of wild stories, but I think, um, yeah. Oh, HS stitched 'em up a bit. So those plans got scrapped.
[00:03:19] Hamish: I, it does look like a pretty epic, um, pretty epic project, but, so you guys, I mean, I'll tell you what, if I wasn't. Like if I didn't have a, you know, pretty, pretty good business set up in Victoria already, I'd be moving down to Azzie in a heartbeat. 'cause some of the locations you guys build on are just incredible.
[00:03:36] Saxon: Yeah. It's um, I saw you, I did see you lurking around down here. May maybe, was that like 12 months ago or something like that?
[00:03:42] Hamish: I've been down there, I've been there a couple of times. Yeah, a
[00:03:43] Saxon: Yeah, yeah, yeah. And um, yeah, we, we, we've got, definitely got the luxury of, um, nice locations. Um, these sort of just random projects pop up where. People have purchased, you know, properties or, or land in real remote locations.
[00:03:58] I did another one [00:04:00] down to Tasman Peninsula, again, had to crane stuff in from Victoria transportable modular set up. And it was just the same kind of challenges, but super rewarding at the end. So yeah, we do have that luxury.
[00:04:13] Hamish: So let me ask you, um, you are the son of a builder. How did you get into architecture and, and did you ever consider like going down, you know, the hands-on tools path like your father?
[00:04:26] Saxon: Yeah. Yeah. So that, that is correct. Um, the old man's a, a carpenter and still is like one of those classic carpenters that's just like still driving around and a clapped out Navarro that's never been cleaned with like two old toolboxes strapped to the back. I grew up in a lot of construction sites from a young age just.
[00:04:47] Just hanging out and, you know, just seeing what's going on before, um, building sites got a little bit more, um, tight regarding OHNS, but, um, I was definitely exposed to a lot of carpentry and, [00:05:00] and, you know, timberworks and all that. And I kind of had this a bit of artistic sort of side to me as well. So I was kind of always sitting in that cusp of like, creativity versus like, you know, building.
[00:05:12] And I ended up sort of slotting into a housing and design course in college and then kind of just rolled straight into, um, you know, environmental design, which then rolled straight into a master's of architecture. And it kind of just, but um, you know, dad was always onto me. Like, he was just like, you know, if you, if you're gonna go to architecture school, you know, you, you know, you've gotta have at least minimum two years on the construction side or, you know, working for a builder to know what you're doing.
[00:05:38] I was like, yeah. Right, right. Yeah. And I never really. I jumped on board probably that as early as I should have. But I did get to the point where I was like, you know, I'm gonna, you know, spend some time working under a builder. And I did that, but that's kind of how I landed in it. Um, never
[00:05:53] Matthew: Tell me more about that. I wanna know more about working for a builder because Liam from Hit Be Height made the comment when he come on that [00:06:00] too much time with architect courses are spent on random architects and whatnot. The be not enough time he spent on site. And I feel like that is so valuable, especially when we talk about respect and we'll get that the conversation.
[00:06:11] Builders and architects probably love each other but hate each other. It's a bit of a weird relationship, but I feel like that bridges the gap so much.
[00:06:21] Saxon: yeah, it did. Um, it was a pretty mind boggling experience. Um, and, you know, I'm not saying in a sense that I went and like, you know, strapped on the tool belt and attempted to construct anything. I was more sort of slotted into the, um, you know, learning estimation and project management side of things. It was real eyeopening. I actually chose to do that. I, I came outta working for a more of a, a sort of high-end, um, sort of level residential architectural firm, which a, with a, with a traditional architectural process straight into like dabbling in, in experience with a builder for two years, right at like that tail end of like coming off [00:07:00] COVID, where like in Azzie and probably Victoria as well, like the building market and the cost of everything were just skyrocketing and they were just out of control.
[00:07:10] And I was like straight into the, the crux of like learning, estimating and project management, um, right on the tail end of the, the COVID situation. And just seeing prices just skyrocket, trying to manage clients and budgets and actually contract jobs. Um, it was, it was, it was a wild experience, but, um.
[00:07:30] Yeah, definitely the ease into it. But yeah, learned a lot at the estimating thing was probably the biggest thing I took away from it. Getting a really good understanding of like how things are costed and, and those things that, um, if you, if you haven't got estimating experience, you kind of, and you're just doing architecture, things might slip over.
[00:07:45] You think things cost X amount of dollars, but you're not considering sort of A, B, and C. So I reckon the estimating thing was the biggest thing I took away from it. That helps me in today's process, um, here at all. Align, I reckon.
[00:07:57] Matthew: Do you still comment [00:08:00] on the bill cost when you're involved in a project now, or you leave that up to the builder?
[00:08:04] Saxon: Oh, no, definitely not. So, um, our, our process that we've developed here at all Align, which we continually, um, sort of refining, um, as we're moving along. Um, we use like a, a different kind of a, a sort of process of bringing builders on in projects. And we, we bring builders on a lot earlier in our projects, really from day.
[00:08:26] We actually get, um, our builders in through like a negotiated contract process as opposed to like a tendering process. So we find a suitable builder for our client, um, basically on on day one before we've even put pen to paper. And they're involved in, um, three critical, um, estimating processes through the project.
[00:08:45] One right at the start, sort of one after the concept is developed, and then right at the end before we contract the job. So, um, we basically do that estimation process with our builder. We, we sit down with our builder [00:09:00] and we go through the detailed estimate before we've met with that client and make sure that we've fleshed out any, um, ideas for cost savings or swapping things around.
[00:09:08] And I think, yeah, that process has like literally given us the best results. I haven't been in the industry for a whole lot of time, like, you know, 10 to 12 years in the architectural profession, but I can safely say the process that I'm doing now with early contractor involvement and negotiating contracts is.
[00:09:25] Has paid off hugely for us, um, in the last few years.
[00:09:30] Matthew: Why do you think there's still resistance against the negotiator tender model?
[00:09:33] Saxon: Tasmania is especially hard. We're, we're in a very small community down here and I, I have seen a lot of, um, sort of people stuck in their ways in terms of going down a tendering sort of path. Um, and I think that it's been hard for people to break away and really see the value in, in just, you know, working with a builder that, that's [00:10:00] transparent, that everyone can trust and that that can work together from day one.
[00:10:03] And they've got the, the catalog of data to be able to understand costs from day one. And I dunno if I've got an answer for you, um, Matt, in, in sense of why. Other people haven't jumped on as quickly as I can, but, uh, you know, as, as I think they should. But, uh, maybe it's just, they can't sort of see that, you know, if you, if you can compare apples with apples and show like the process, the time and the cost associated with the tendering process versus a negotiated contract and you put 'em side by side, like a case study, I think that would, you know, show a bit more transparency that it, that it can pay off.
[00:10:41] I really wanna see the whole industry in Tasmania really level up, um, in terms of how they're working through their design process and their contract negotiations with clients first, the traditional processes. But yeah, if anyone's out here, out there and wants to, you know, ever pick up the phone and talk to me [00:11:00] about it, I'll chew their ear off about, yeah.
[00:11:01] How it's worked good for us. 'cause they've had the most success, um, yeah, doing that process.
[00:11:06] Hamish: The same can be said for, you know, me and Matt might ask the question of. Probably most of the builders in Australia and why they aren't building, you know, durable, healthy homes that are also energy efficient and, you know, beautiful to live in. You know, we've drunk the Kool-Aid because we've chosen to take, to go down that path.
[00:11:28] Um, I actually think it comes down to the fact that people just don't know, you know, if you look at, and again, this is absolutely just my opinion on the situation. If you look at what architects are taught at school, they're taught design. Like the first, and again, correct me if I'm wrong, but this is my understanding of it, the first two or three years, it's all about just design with no limitations.
[00:11:50] You know, just, just design. Don't think about what councils are saying, don't think about things structurally, just have that freedom of [00:12:00] designing and it's, you know, and they're told, uh, well, I don't think they're taught. How to cost projects or understand really how things go together and actually the value of the things that they're designing.
[00:12:12] So I personally don't blame architects or if there is a, if there is, you know, a blame to be put somewhere. I don't necessarily blame architects for not knowing what things cost because they're not taught how things are cost. But just in that right there, if you think about what we do as builders, we cost projects all the time.
[00:12:34] So we have an idea of what things cost. And I think like my biggest beef of the whole thing is when I get told by someone that, that's too expensive, when all I really wanna say is no my, I'm not expensive, the design's expensive 'cause I'm just quoting what I'm looking at. And again, I'm absolutely not blaming the architect for, or architectural [00:13:00] designers or whoever that prices are outside of what the client wants to spend.
[00:13:05] I just think everyone needs to understand where their inputs required in the process. So maybe that's just my roundabout way of kind of segueing into, you know, the, the, the builder that, so the architect that you work for and the company you work for. 'cause you are owned by a builder. You know, aligned architecture is owned by a builder. mate, could you just talk to us a little bit about, um, aligned architecture and it's set up, um, and, and just, just for the record, if no one has seen a line projects before, I've been watching these guys for a few years now and, you know, I've been following Luke Davies for a, for a while. Like, we're not talking about builder design homes, we're talking about architecturally designed homes.
[00:13:48] So they are beautiful homes to, to look at and living.
[00:13:51] Saxon: Yeah. So, um, that's correct. The, the company was founded, yeah, by a builder. and Luke sort of, you know, evolved the [00:14:00] business off the back of, I suppose, frustrations and things that he'd learnt, you know, mistakes that have been learn, um, along the way. So he basically wanted a solution where. The architectural process, um, you know, was, was basically focused, not just on the client relation, but integrating the builder, in at the same time. and it's, it's gone through a lot of different, a few different variations before it's got to where it is now, but, um, essentially it's, it's about, you know, it's called the a BC method, so it's a bit corny, but it's called the Aligned Build Collaboration method. So it's having, you know, the homeowner, um, the builder and the architect, sort of all in the one mix of the sort of one time, um, and the builder being involved, um, from as early on in the design processes as possible.
[00:14:52] So, yeah, to answer the first part of your question, that's sort of, where it stemmed from. kind of forgot the second part of your question already, but Yeah.
[00:14:59] Hamish: I [00:15:00] kind of went on a bit of a ramble there for a bit, but I reckon I've been watching Matt something un.
[00:15:07] Matthew: I kind of want to go back to the whole negotiated tender. I, I have a few problems with it that the, from a builder's perspective, and I'm gonna talk only from a builder's perspective here. The issue I hate is when you get a, you get an architect question, the fee to be involved in the project. Like, or why are you charging? Or does, do you give it back if the project goes ahead? And my response at the moment to that is, do you give your money back if the design doesn't go ahead because it's over budget didn't really sit well with the person I said that to. I won't lie,
[00:15:42] Saxon: No, I couldn't imagine.
[00:15:44] Matthew: but that's the reality.
[00:15:45] Like I, I, I have, and I'm, because I'm gonna ask questions that they're kind of loaded. But it's good to get an architect's perspective on it because for some reason architects listen to architects and most, and builders listen to builders. And some builders listen to architects, and some architects listen to [00:16:00] builders.
[00:16:00] But I wanna get an architect's perspective on it.
[00:16:02] Saxon: Yeah. Well, I suppose my perspective on it is like, because again, I came, came back to that experience of that couple of years working in the, in the, in the pressure cooker estimating, project management management. I, I saw firsthand how long it took for, for a builder to be involved early in the project.
[00:16:20] Um, and the amount of time that I had to personally sink, um, into, you know, estimating projects. And so it was, it was at that, that point I was like, ah, I understand now. Like this takes a lot of time. So like, I'm starting to work with a few other builders in the Hobart area that are just starting to come on board the process and a few of them.
[00:16:43] Yet they, you know, we do what's called a pre-build feasibility. At the very, very first part of the project before anyone signed any agreements, anyone's put any pen to paper and it just outlines all the costs associated with all the, the, the architectural design, the interior design, the council, the [00:17:00] consultants and fees from builder builders.
[00:17:02] And, um, you know, I actually encourage any of the new builders that come on board this process. I'm just like, yeah, you guys have gotta charge a fee for your time. You've gotta charge it, um, at the, the concept design stage when you take away the drawing set to do an estimate and you need to charge for it at the end because time's money.
[00:17:21] And there's no way that the fee that's put forward covers off the amount of time that you guys have gotta sink into trying to get a job contractor. But at least it does two things, that it covers off a lit on a little bit of that time. It actually just shows a financial commitment, um, from the owner to the builder that, Hey, these guys are serious.
[00:17:38] We we're all in it to, to go through to the end and to get a project built for you, you know, on budget. So the small financial commitment shows that hey, you know, the owners, the owners and clients, um, keen the builder's serious. And if you ever get a client that's turns their nose at like a, you know, whatever the fee is, it's quite a small amount.
[00:17:59] You [00:18:00] probably know, oh, we could be in for a little bit of a rough trot here if they're, they're not wanting to pay a builder a small fee to spend their time estimating. So I've got a quite a positive, um, spin on it. But I have heard within the industry down here that there is a few other architects that are, uh, are starting to become aware of the, the fees that, um, estimating fees that builders are sort of charging to cover off in their time.
[00:18:23] 'cause time is money. You know, like you can't expect people to work for free. I'm not gonna work for free. Um, you guys aren't gonna work for free, so,
[00:18:30] Matthew: We still are, we're still not charging what it costs, and this is what I'm gonna say to Ham, how many hours do you think you put into a project from the start to the end before it gets to site?
[00:18:38] Hamish: So I can speak to this because we've just done a whole bunch of, um, uh, data collection on it. Dan and Robert would spend about 200 hours, um, doing the pre-construction phase to get to the point where we're delivering a price. And then there's usually another 40 to 60 [00:19:00] hours from the moment we give a price to the, to the time we actually get to site.
[00:19:05] 'cause that might involve a little bit of, um, contract, uh, sorry, value management. Uh, we might need to be assisting the design team with report and consents or building permit considerations. We might need a construction management plan, et cetera, et cetera. And I'm also spending about 16 hours in our, what we call our feasibility phase.
[00:19:27] So that's where I'm actually involved with, um, getting some quick build estimates together for the client. So what are we up to about, you know, two hundred and fifty, two eighty six hours?
[00:19:40] Quick mass. what, what,
[00:19:41] what?
[00:19:42] Matthew: bucks would be a very low amount for a consultant in
[00:19:45] Hamish: let's do a, let's, let's do one 50. And I think that that's on the low side.
[00:19:50] Matthew: That's 42,900. And a builder's gonna change charge. Maybe 10 to 12 grand. Maybe maybe 15,
[00:19:58] Hamish: yeah,
[00:19:59] Saxon: so a small [00:20:00] portion, um, and like I
[00:20:01] Matthew: but not, not small, more than half.
[00:20:03] Saxon: I have heard a lot of people, or a lot of builders down here is. Just starting to get to that point where they're, they're just like, we only do negotiate a contract, um, process.
[00:20:14] Um, we are not, like, if they have tender to land on their desk, they're like, no thanks, because their chances are, are significantly dropped to winning the project. Where if they're doing, yeah, if they're doing a negotiated process, their chances are higher. If they, if they do our process where we're bringing 'em on from day, do their chances of signing on that job are extremely high.
[00:20:34] So, um, yeah, it's pretty interesting and it's, it's hot discussion down here at the
[00:20:39] Matthew: And the build price at the same, the tenant to negotiate tenant is probably the same price.
[00:20:47] Hamish: I mean, yeah. Yeah. I think I, I can understand, intellectually understand why someone would want to go to Tender because they'd wanna see a spread of prices. Like I totally understand that we're actually encouraging [00:21:00] clients to, at our feasibility stage, chat with two or three builders. You know, they might talk to Matt, they might talk to Mark from MBH.
[00:21:08] And I'm like, look at this stage, expect to pay between 500 and $1,500 to get someone to give you an opinion of cost. At that point in time, it's at that stage maybe spread, you know, head your bets a little bit there. You might be spending a little bit more money now, but you're getting a spread of where the industry is saying that your project is gonna be benchmarked at.
[00:21:31] We've, in our, at sanctum homes, we've kind of shortcut that a little bit by doing an in-house costing, and we're also sending it out to price of plan to do a QBE as well. So we are getting two independent prices, one from us and one from outside. But we're we're encouraging clients to talk to builders and get them, you know, and, and we're, I guess we're, we're suggesting talk to builders of the level that we're.
[00:21:59] The [00:22:00] product that that, that we're, you know, gonna be delivering. So let say talk to Matt, talk to Mark, talk to Dylan, talk to these guys because they're gonna deliver a similar product to us and see where they think the project's gonna land. But, you know, once we go into that pre-construction phase where we're spending those two to 250 hours, like that's when we wanna make sure that all the time that we're putting into this project is actually resulting us delivering you a project on budget or what you wanna spend, but also getting it to site.
[00:22:33] Matthew: But we also have passive house knowledge, ham, like you've built a hemp creek house that if someone's coming to you for a hemp coat house, they need your expertise. That project most likely doesn't go ahead correctly or well without that. And the fact that, let's just call it $150, if you went that to an open market, someone's gonna charge three, four, $500 an hour.
[00:22:53] Saxon: I know you guys are supposed to be asking me questions, but my kind of question on this is if there's, I suppose if there's any other architects that [00:23:00] are watching this. I don't know if you have many architects that watch this podcast. It's just like, they're probably thinking, um, well, what about, you know, what about a quantity surveyor or an external cost, um, consultant?
[00:23:11] Why, why can't we just use, you know, a consultant like that at those same points to get the same result? And I'm always intrigued to know from other people in the industry, how, how, how does that slot into the process? Is it. Does it work? Is it just something that's not ever acknowledged? Is it, does it, is it ever accurate?
[00:23:32] Matthew: a quantity surveyor bases their data off historical values.
[00:23:36] That's how they get their numbers. So by the time that they quote the project at the start, it's usually confirmation bias for everyone to be like, yeah, it's, it's validated so we can go ahead and charge our fee. But the thing is, when the builder quotes, it's an estimate based on the real cost at that real time, based on that job specifically, and a lot more detailed.
[00:23:57] So from that, it it, it's [00:24:00] like, it's like they give the recipe, but you are the checkout at the, at the checkout counter at this grocery store, getting the real amount of what it's gonna cost kind of thing.
[00:24:09] Hamish: my thoughts are that I think quantity surveyor and cost planners, you know, they have a, have a space and, you know, I think it's valuable, but I also know that, you know, being part of, you know, future builder. Every single one of us, and even talking to my network, every single one of us has a, has a break even point for our overheads.
[00:24:30] It might be between 12 and it might have been at 70%, 17% markup. So how, and then obviously from there, we then need to make money. So our market might be 25, 30%. Now, is that being taken into consideration when someone's coming in and not knowing the spread of builders, they're gonna gonna be involved in the project to cost them. So I think the fairest way to do it would be to get cost planned, but take out [00:25:00] supervision, take out project management, take out contract admin, and then take out any markup. And then you get builders come in and then say, well, my business structure needs X, Y, and Z and I'm thinking that we need a supervisor on it 50% of the time, so I'm gonna be allowing X amount for that project.
[00:25:19] And I know my markup needs to be 25% before I even start making money. So that's where I think you can see some, some, some variance in when you get a cost planner or a quantitative owner involved. And then you might get two or three builders, quote the job.
[00:25:33] So I
[00:25:34] Matthew: historical data though, so that project might not go ahead for 18 months. They're basing their data at that point on only 3-year-old data.
[00:25:43] Saxon: Yeah, my experience, 'cause I've obviously used quantity surveyors and cost consultants prior to using, um, this process that we're talking about now with the align. But my experience has been that when I've had quantity surveyors do estimates on [00:26:00] jobs, they're just a document that arrives in your email.
[00:26:04] They're usually coming in pretty hot early on in the project. And what I've had is you present that to the client and what I've seen is just instant freakout, pull the pin on the job, there goes my work, there goes any future builder's work, whatever. And, and they, they, they've sort of storm off pretty frustrated with where it is.
[00:26:26] What if fine with working one-on-one with a builder negotiating a price? Okay. We still have some prices coming that are not aligned with the client's budget, but at least. I do this with, um, you know, the guys from into construction down here in Hobart all the time. If we have something that's coming a little bit hot, we'll sit down the week before we'll go, okay, it's coming in a little bit hot.
[00:26:48] Um, what's our, what's our strategies? What are we gonna do to try and go into this meeting with solutions early on? And we can, we can literal 'em, put 'em side by side and actually develop a strategy and go [00:27:00] into solutions and then come outta the meeting with a client that's feeling okay, that we've got it under control.
[00:27:05] Um, where the cost consultancy documents, you don't have that, that personal connection and, and relationship and that you can actually pull that off. Um, so yeah.
[00:27:18] Hamish: I was, I was about to use a really crude, um, analogy here, but I'm gonna use it anyway. I kind of feel like, um, like a cost consultant or a, or a feasibility study is like making love with no foreplay. 'cause it's just like banks. There it is, you know? Um, like it or lump it. Whereas I kind of feel like I see you laughing about it.
[00:27:39] I kind of, I I love, I love what you're saying there. Like, we're literally going through a process at the moment where we've done feasibility on a job and we're now sitting quite high where we want it to be. And now Dan and I in Precon, we're actually come, we, we want a list of items that we can go back to the client with. Um, you know, and this is in consultant with the designer [00:28:00] and architect as well. Go, Hey, we, we know we're over. We're not just gonna say, well like it or lump it. We're like, well, this is how we're proposing to bring it back down. You don't have that same relationship when you are using a cost planner or, or a, or a, um, or a quantity surveyor, because I kind of feel like they're just checking boxes.
[00:28:18] All right, another job come in, here's the number. Next job. Come in. Here's the number. There's no, there's no emotion attached to it. Like, I know for me, like I've got a lot of integrity in what we do. So if. My original feasibility is lower than what that cost is. Like you bet your bloody ass that I'm working really hard to get that pro that down or come up with solutions.
[00:28:42] But this is where that like true collaboration comes into it. Like, like all the things that you are saying right now just ring so true to, to
[00:28:50] Matthew: Say, Hey, what's your, what's your go to saying?
[00:28:53] Hamish: Ah, well, the go-to saying is the architect gets their project built, the client gets a beautiful home, [00:29:00] and the builder makes money.
[00:29:01] That's a successful project.
[00:29:02] Saxon: back to what you said earlier, um, Hamish, about, I think you might have said like, you know, tendering a project, like you don't, you don't blame the client for wanting to tender a project. That's really valid point. And I kind of put myself in those shoes. If I was a client and I was doing my own home, I'd probably think about that as well.
[00:29:24] But I think what's important here is that. We're only sort of working with builders that we know, that are, that are honest and, and and super transparent. And, you know, between myself and, and Mitch, who's also in the business, who actually was an estimator for multiple years and our builders being fully open book, like they're getting to the point now where they're just laying all costs out the table.
[00:29:50] Like we're talking about a nine 12 page document, which literally shows every single cost associated with every single fix fixing, finish labor, the [00:30:00] whole lot. It's like, what's all out on the table there? There's nothing to hide. We can all see it. We've got the experience behind us to be able to break down those costs, ask the questions that we need.
[00:30:10] The client's got it, they get emailed it after the meeting with all those figures.
[00:30:13] Matthew: But you get it
[00:30:14] Saxon: gonna,
[00:30:15] Matthew: though. The issue
[00:30:15] Saxon: full extent of, of showing their, showing their up mark, you know, it's getting pretty, pretty good. So there's no excuse. Like if it's all out at the table, no one's hiding anything. That's what it
[00:30:26] Matthew: but you, you get it 'cause you've been on the backend. The issue that we have is like, oh, but this other builder did it. Instead of $80, he was doing it. 75. Can you do 75?
[00:30:35] Saxon: Yeah. Yeah, we, um, oh geez, Mitch, Mitch in the business also has this comment. He says like, all builders cost the same. It's just like how transparent a builder and how much they wanna show early on. Like, at the end of the day, whether you pay for it, um, honestly and openly in a, in a, in a lump sum at the start, or whether it's undercut and you pay for it in variations, they're gonna end up at the same price.
[00:30:58] It's just where you pay it and how much [00:31:00] frustration you have to deal with, um, from a client's point of view. So, yeah, look how you get that message through to the broader communities. Uh, that's, it's gonna, it's gonna be a big thing when someone can pull that off on a broader scale.
[00:31:13] Hamish: I certainly don't want, you know, any architect listening to this to think that, you know, we're right and there wrong, like, and I certainly don't wanna be coming across like that to you either. Um, but I guess what I will say is like, we're the one. They're on the ground executing it, we are building it.
[00:31:35] We're actually seeing the real time cost of what things, uh, cost us. And, you know, what if, if at the end of the
[00:31:42] Matthew: we hold the risk? We hold the risk
[00:31:45] too.
[00:31:45] Hamish: and, and, we hold the risk to you know, and this is a recent thing for us at Sanctum Home, the last couple of years, like we've been really trying to dial in our, like, actual category costing in our, in our projects.
[00:31:56] Like, so we can actually see, you know, where we're winning and where [00:32:00] we're losing or where we need to, to adjust our, um, costing. And that's feeding back into real time. 'cause we might have four projects on at once, but then we might be costing another wave of projects at certain stages so we can actually, we're constantly feeding that data back into what we're doing.
[00:32:18] So, I mean, I think, I personally feel there's real, real value in that. 'cause like, look, as a, as a, as an architect or a client, the last thing that you want to happen is you build it to go broke. Because that is an absolute shit show. Like you want the builders to make money. So my question to you, Saxon, like how do we solve this problem?
[00:32:41] Like I and, and I think the problem being that the default for architects is to go to tender.
[00:32:47] Saxon: we've gotta educate the broader community, and I'm on the same page ish. I'm not saying that this is, you know, I'm not gonna sit there and preach that this is the only way to do something. It's, it's like there's, there's many ways to skin a cut, as they say.
[00:32:59] This is just a [00:33:00] process that I've sort of fallen into that works for me and works for the team, and we've had quite good success through it. and I'm not making those comments out of what I think, like I know it was only two short years that I was in that building industry, but I was in the position where I was working for a builder in the same city I'm designing in and I'm seeing inquiries and projects come in from external designers.
[00:33:26] Right. And I'm assessing and estimating those and I'm seeing 'em fall over in front of me. So it's not like, yeah, this is, this is off my personal experience, but how we teach people, um, that wanna know about this process and, and sort of stepping, stepping into this new kind of negotiated style.
[00:33:47] Um, it's just about educating. We've gotta, um, just educate anyone out there. I, I encourage 'em to always pick up the phone and have a chat to me about how we're doing it.
[00:33:56] Matthew: The education's there though. I think people also turn a blind eye to it, [00:34:00] like they come on, like everyone's on social media these days or can pick up a blog or listen to a podcast. The information's there. They choose not to listen to it. It's like, let's, let's look. Let's go to passive house for an example, or high performance building.
[00:34:11] Building. Tell me what part of it doesn't make sense that people continually choose not to go down that path.
[00:34:16] Saxon: Yeah. Um, that's a good one. I think what I've seen in the design industry for passive houses, this perception that if you are going down the passive house direction, you, it, it like eliminates that opportunity for those higher end poetic architectural concepts that, that might have a negative effect on, on the performance of the home.
[00:34:46] Does that kind of make sense? Like I've just got some comments from.
[00:34:49] Matthew: though, hasn't it? Surely.
[00:34:51] Saxon: It's just like, I think pe some PE people's perception is like if you are gonna build a passive home, it's just gotta be like a square or rectangle with like a simple [00:35:00] roof and some windows slapped on the side of it. And then that, like anything that you try and do out of that is going to cause problems for, for certification.
[00:35:08] Hamish: my take, my take on that is like, yes, some buildings are a lot easier to certify than others. That's, that's true. That is a a hundred percent truth. But my challenge that I'm throwing out to architects is use passive house as just a another site constraint. Like if you've got a building over here or tree there, or you can't build to the boundary or you've got certain setbacks or whatever, these are all site constraints that you need to then apply to your response to the, to the design. Passive house is just another constraint, so it should be up to the designer to then come up with a solution of how do you then layer this thing called passive house, this constraint called passive house into the design and make it beautiful. Like don't blame don't, don't blame passive house for not being able to deliver a beautiful [00:36:00] architectural project.
[00:36:01] Saxon: It is just another, you know, challenge that you've gotta work your way through. Um, I'm doing a pretty big passive house down here in Hobart, which I can comfortably say is the most architecturally concept driven, poetic project that I've ever done in my short career, 10, 12 years, whatever we wanna call it. it's got all those conceptual ideas that you see, you know, in quite rich architectural projects, but they're going for the highest level of passive certification. Um, you know, possible. And, you know, I hope that when that gets done, we, you know, that could be used as a bit of a case study to the community to say, Hey, you know, that passive house thing you're scared about?
[00:36:48] No, you can still do this style of design. You can still have these crazy concepts or whatever you want in this home. Um. Still pull it off.
[00:36:57] Hamish: so you, you've actually, [00:37:00] you've, you've, you've mentioned it a couple of times as we talk today, and you've, it's also come up a couple of times in the, um, in the form we got you to fill out. But you refer to poetic nature of architecture, and I like, I love those words put together like that. Could you maybe explain what you mean when you say, uh, never lose sight of the poetic nature of architecture?
[00:37:25] Saxon: when you talked about architecture school, um, earlier on, it's just like the purpose of what architecture school is. it's all driven around creativity and design, and it's a, it's an artistic form.
[00:37:36] It's an artistic creation. All those basic things about learning about. Costs and council and consultants, that all comes after the fact and it's kind of sometimes half people to grasp. But if you apply those really artistic, conceptual, poetic, um, ideas to a home, so say whether it's some kind of, [00:38:00] um, idea that's driven by a connection to the landscape we're in.
[00:38:03] So, um, you know, for example, the Hillcrest Rise project that I'm doing, which is the, the, the passive house one on in Tolman's Hill, which is not too far from where we are. I've connected the whole idea of the form and the materials and everything to do with the building has this real strong connection to the organ pipes and the stone formations on the mountain behind.
[00:38:24] So that's like an example and I, I, whether it's like a material I'm, I'm picking or the, the shape of bathroom joinery or the proportions of windows, all those like fluffy things that you might think are not important. If you apply that thinking to the whole design process from the bigger, broader, conceptual ideas right down to the kitchen joinery and the shape of the handles and the material that you've picked, what you end up with is this, this sort of project that has an end result that, um, it, it, it flourishes in a way that it, it, [00:39:00] it provides these opportunities for the client that they, that they'd never thought of.
[00:39:04] Whether it's a space they're sitting in, drinking a cup of tea in the morning and they're getting filtered light through windows and they just have a, a sense of calm, like capturing those things in the design and, and, and hanging onto 'em all the way through. Just, you know, it, it creates this like amazing, amazing thing.
[00:39:24] And that's what I'm sort of trying to grasp is they're the things that architects love because they're creatives and they're, they're artistic and those things. And passive house, high performance can go hand in hand and I'm out to prove it. Um, so that the community down here can see that, yeah, we wanna get on board this and, and how do we do it?
[00:39:46] Matthew: But that's what we want. We want architects to be architects and be creative. Leave the building and costings to us. Go, go be even more creative and we'll deal with performance side for you. We'll deal with that side of things for you, um,
[00:39:59] and make.
[00:39:59] Hamish: [00:40:00] before we go too, before we go too further on that point, Matt, I, I actually think that that, and sorry to interrupt for a second, but s your explanation of why. We need to not lose sight of the poetic nature of architecture. I think how you explained that was so beautiful, by the way, even though that
[00:40:19] Matthew: Slow poetic.
[00:40:21] Hamish: poetic nature of architecture, I think is the most wanky architect thing to say, I bel, I, I actually believe in everything that you've just said, because that becomes the narrative for when their client's friends come over and you're pointing all that stuff out.
[00:40:37] And these things really shouldn't be, in one sense, they should be really obvious, but in another sense, they should just make sense when you go into a home. And the, and it might just be a bit of a side comment saying, oh yeah, that's really drawing on, you know, the flutes of, of that particular, um, mountain range behind.
[00:40:56] Like that should just be a side comment. But you should go into a [00:41:00] home that just feels right and without architectures. We don't have any of that. We have just boxes on a block land, and then we just rin.
[00:41:11] Saxon: To tie this together, Matt? Um, I think your comments very valid in, um, in saying that like, we need to constantly, and I'll do this and I remind the team of this to tap in. To the experts that know what they're doing. So whether it's the builder that's managing cost and buildability, whether it's, you know, the team at Harvey Norman that know their stuff about appliances, whether it's the joiner that knows how joinery goes together, or the lighting supplier.
[00:41:44] Use those people that are experts in that field to bring it all together. Because a lot of people, I think, try and take all that on themselves to try to be the experts in everything, whether it's sanitary wear, whether it's estimating construction [00:42:00] costs. But there's other people out there that can do a 10 times better than you.
[00:42:04] So don't be afraid to, to, to jump on 'em and, and, and use 'em as you need. it's real important.
[00:42:10] Matthew: Where do you think builders go wrong with architects? I sit here and Jo, like jokingly take the piss out of architects. I find it fun and it seemed to poke the bear. And get 'em going. But let's go to the flip side. Where do you think builders go wrong?
[00:42:20] Saxon: there's a few projects where unfortunately we don't get the opportunity to be involved in the construction process for whatever reason it is. It might be a contractual thing, a mechanism that doesn't allow us to be heavily involved.
[00:42:35] It might be a finance thing where maybe the clients have just, they've spent a fair bit of coin and they're not ready to pay an architect for 12 months or eight months to be involved. So in that situation, we, we stepped back and maybe we might only turn up for a couple of site visits to view progress, but where I think builders sometimes go wrong is they were taken into their own hands to.
[00:42:57] Swap or substitute something, [00:43:00] thinking about the compounding effect that it has on something. So say for example, I'm real like notorious for, um, you know, swapping out, uh, for using like a, a, a timber cladding profile, which is, I call it inverted board and batten. So rather than than a, the sort of a traditional board and Batten process, you've, you've flipped it on, its on its back so that you've got the wider covering board at the front and the shallower, um, backing board.
[00:43:34] And, um, I actually grasp hold of that from my, my previous architectural office at Morrison and Braden Buck where I, where I learned that technique and they taught that to me. And it, it increases the, the airflow, um, behind all the cladding. It gives more distance for, for movement in, in this climate where.
[00:43:53] We have extreme colds and super hot, hot summers. Um, and [00:44:00] this is just one example, but then like a builder would, would, would go out in the limb and say, oh, we're gonna swap that out for a shiplap v roof cladding because it, it costs x amount of dollars less. But then I've seen firsthand that in this environment, like shiplap doesn't track well in this environment.
[00:44:16] The, the secret fixings don't have as much room to move. We've seen, um, shiplap popping out, um, you know, window flashings and doing all kinds of crazy stuff and it's probably gonna, you know, that could have a, a ramification down down the line. So like, there's a reason I specified that inverted board and Batten, just 'cause it looks similar to shiplap.
[00:44:37] Don't just go swap without to save someone $6,000. Like it's, I've put it there for a reason. So there's probably heaps of different examples. Um, but that's just one that I've seen happen a few times on a few different projects. It's like, get rid of the inverted board and Batten just.
[00:44:53] Matthew: frustrating.
[00:44:54] Saxon: Shiplap that I got on special from 10 at the time.
[00:44:57] Hamish: I think the conversation still exists though, [00:45:00] like that as a builder in that pre-construction process, like I think we should have agency to say, Hey, you know what? I've got this other cladding option. Particularly when we're going down that value management path, I, I think that conversation should still exist.
[00:45:16] However, it needs to be respectful and then you need to understand why that particular cladding was sought out in the first place. But that's where that. That's where the true collaborative process comes into it. It's not just the builder going, Hey, client, I can save you six grand. It's like, Hey, let's all have a conversation here around why this cladding exists as it is now, and what are the ramifications, what are the pros and cons of maybe switching to a different one?
[00:45:43] And I think one, you can't get that if you just did that typical, you know, bid build kind of process where it's going to tender. But you can actually have these conversations along the way before you get to site. So by the time you get to site, everything's resolved, you as the architect is really happy [00:46:00] with the end outcome, the client's happy with the end outcome and the builder's comfortable where the price sits.
[00:46:05] Matthew: I don't, I can't get my head around sopping out without asking the question. And I know the architect I share in office with, she's had that problem multiple times and I'm like, I'm confused. Like the, it's on the documentation, the contract. Um, why is it changing the buildings?
[00:46:18] They should also pull 'em up on
[00:46:20] Saxon: Yeah, that's another good point. We, we've, we've building surveys have really been tightening their belt here in Tassie over the last few years. Um, Well, from what I heard, there's quite a big claim situation on a certain project, you know, that that caused a bit of an insurance hike for everyone in the industry and it, it took a few out.
[00:46:38] And then the others that have remained of are, are being a lot more cutthroat with things. So if something's changing from the building approval docs, we are now having to go through the process of updating the architectural documentation, recertifying the drawings, and resubmitting it back for approval.
[00:46:55] Where, you know, five, five years ago, builders could swap things out in site. [00:47:00] It'll get inspected and it gets signed off and on your merry way. So people need to be aware of that. As soon as you are, like Matt said, as soon as you are changing something on those documents, you could be opening up. Like, and then who's paying for that?
[00:47:11] Who's paying for, for, for us to readjust the drawings recertify. Um, so it can cause a few headaches.
[00:47:18] Matthew: I actually on my own house, um, I shrunk my deck by 200 mil, so I went to the billing surveyor and I had to go back and get a report and the secondary consent from council, 'cause they needed to approve it, which I was like, this is ridiculous. Like, we've got, like, I slightly off topic, but the NCC isn't a problem.
[00:47:36] Why? Things take forever, it's cancels. Um, but I agree we've gotta have somewhere to, go back and, there's gotta be a good train to keep everything moving as per the drawing at the start. sorry, I've got a crying baby here in the background,
[00:47:48] Hamish: hear, I,
[00:47:49] can hear Matt's crying baby in
[00:47:50] Matthew: yeah, but I want to go, I want to look back to the start a little bit too.
[00:47:53] Um, going back to your dad being a carpenter, when you told him about passive house, what did he say?
[00:47:58] Saxon: Oh, this is the [00:48:00] fuel you're looking for. Look, I find, um, with a lot of those. Builders that are out of the, the city and you know, they're out the sticks or they're in, out the east coast. I talk, I talk a lot about like, you know, even the discussion around, um, cav, you know, vendor, vendor cavities and cavity batten systems.
[00:48:20] You get the old, oh nah, what do you, what do you, what do you mean? No, we've been doing stuff like this for 20, 30 years and you don't need that. And then the time that I told dad, I was just like, oh, claddings like, not your weatherproofing, like your weatherproofing is your WIB, like I I I said the claddings just the rain screen.
[00:48:39] He lost it when I said that. He was just like, what do you mean the claddings of brain scream? Couldn't understand it. So I haven't even gone down the path of passive house discussions
[00:48:49] Matthew: Does he get it yet?
[00:48:51] Saxon: nah. I, I talked to him about air tightness and uh, and, and mechanical ventilation and he is like, oh, I dunno about that.
[00:48:58] You know, I think you just need to your [00:49:00] windows,
[00:49:01] Matthew: my favorite was you asked them why, and it just unravels 'em. Like, why don't you need the ventilator cavity? Oh, cause,
[00:49:07] Saxon: Yeah. Yeah,
[00:49:08] Matthew: cause, cause, why?
[00:49:09] Saxon: But,
[00:49:10] Hamish: I actually, I actually wanna get your dad on Saxon. I'd love to get like just someone else. I mean, obviously like right now, the three of us are just yelling into an echo chamber, right? Like we're, we're all agreeing with what everything's saying and you know, we're gonna walk away from this feeling that we solved all the problems.
[00:49:25] But the reality is, there are builders out there who think differently to us. There's architects out there who think differently to us. There's old chippies who just want to keep doing it the same way that they're doing. I don't really know where I'm going with this, but it'd be great to get, you know, some guests on here that are actually challenging.
[00:49:42] What we're thinking because we could just, you know, get so focused on well, how we're doing, it's the right way to do it. It is, I think it is good to get challenged sometimes.
[00:49:52] Saxon: yeah, yeah. Um, I'll just, just a side note on that, back to the Picnic Island project, It's a cabin on an island, off an island. [00:50:00] that client, specifically when I talked about passive house and, and mechanical ventilation, they were, they, they kind of said, you know, like we're building a, a, a shack, you know, a cabin on Tasmania.
[00:50:12] Like, we, we want to open the windows. We want to feel that cool breeze. We wanna experience that being in a remote location and, and feeling those kind of elements. And that's a very valid point of itself coming back to the poetic nature, that that's a conceptual poetic comment that a client's wanting to feel and experience a certain, you know, a certain thing on that project.
[00:50:36] And I, I think that has its place, you know, you
[00:50:39] Matthew: but you can open your windows. You just get to choose when you want to open them. I had mine right behind yesterday. This is gonna be certified very shortly. I, I literally had a. Been all day yesterday.
[00:50:48] Saxon: Yeah. Yeah.
[00:50:48] Matthew: so at the start you said you worked, you had a project with Kyle at the moment,
[00:50:51] Saxon: Yeah, we've got, um, a couple, uh, under construction and, and some coming up as well. [00:51:00] Yeah.
[00:51:00] Matthew: and you obviously work with Luke with his Davies construction as
[00:51:03] Saxon: Yep. Had some projects with Luke. We've got some projects with into Constructions with Peter and Jason down here in Hobart, and Zach Haley compatible construction down here in Hobart as well. We've got a handful of builders that, you know, come, come to us and,
[00:51:16] Matthew: So who's more fun to work with? Kyle or Luke?
[00:51:22] Saxon: oh, that's a good question. Luke's that busy. I don't, I don't actually talk to Luke that much because he's so busy, obviously with future builders and, um, he's been away a fair bit this year. So there, look, there's, I think Kyle. And Matt, you know, Pierce, who's down here in Hobart. We, we do have a laugh. We, we, we do have a laugh.
[00:51:44] They're, they are, they are fun. Um, sometimes have to pull 'em back in, in line here and there, but, um, they're, they've been, they've, they've,
[00:51:53] Matthew: shocked. Shocked. Wow.
[00:51:56] Hamish: Do you know, do you know what, having, having been mates with Luke and Kyle [00:52:00] independently for a couple of years, I think that both businesses are great builders.
[00:52:05] Matthew: It was a loaded question. I didn't think you're actually gonna answer it.
[00:52:08] Saxon: oh yeah,
[00:52:09] Hamish: have, they definitely have different personalities, so that's for sure. And I'm sure if your clients were coming to you, whether they went Davies or because they're Netto builders, they're gonna get a great result, that's for
[00:52:18] sure.
[00:52:18] Saxon: They just, they need to realize just finally that Yeah. That there's, sometimes they, I, I catch 'em a bit off guard where I'm just like, yeah, okay. I've taken off my fun hat now and I've, I've actually put on my contract hat. So, um, let's, let's be serious for an hour and then I can put back on my fun hat after that.
[00:52:35] And I think that's. That's real important. Builders being able to put on different hats when they need to step out of their contractual obligations and talk about something else, and then put that contractual, you know, hat back on, that's, uh, that's
[00:52:49] Matthew: I had that conversation with James from Tico today, and I said, the reason I love working with him is that we can have a really hard conversation and then two seconds later, it's not personal. It's just we both want the same outcome. So we, it's to the [00:53:00] point conversation. We want to make sure the project's viable, so we have the very hard, difficult, straight conversation.
[00:53:06] And then two minutes later we're talking about what we do on the weekend.
[00:53:08] Saxon: Exactly. And that, that's, that's such an important skill set for architects, um, and builders to be able to know when to take off one hat, put on another and, and everything's okay.
[00:53:20] Hamish: Now, even though you are not, uh, you know, you guys are placed down in Tasie, um, you are starting to service the mainland as well. And I know we've, um, you know, we've been, we've been pretty keen to get a, uh, a line and Sanctum Homes project together. And I, and I reckon that'll happen, you know, not in the two, near two distant future.
[00:53:38] So if you are around Australia wanting to engage a really great architect, how could people get in contact with you guys?
[00:53:48] Saxon: Yeah, they can just, um, jump online and, um, just punch in Google, um, align build and they'll probably find their website. You've got an inquiry form there and you can just submit away. We're registered in, um, [00:54:00] Victoria, um, and New South Wales, and I think we're pre-qualified, pre-qualified, um, in, in Queensland as well.
[00:54:07] So,
[00:54:07] Matthew: you able to call yourself an architect in, in Melbourne or Victoria because builder's not like the director. How does that, I know how that works because isn't a little bit tiptoe with that sort of side of things.
[00:54:20] Saxon: Um, so in terms of, you mean in terms of working in Victoria, is it a
[00:54:24] problem or, you gotta be very careful who calls who an architect is that, am I
[00:54:28] oh, yes. Yeah, yeah. No, you actually do, yeah. Yeah. That's, that is a, a thing that's always a hot discussion is I look, basically, to cut a long story short, if you are, if you haven't studied architecture and you haven't been registered by a board, um, which is a pretty hard process to do, then yeah. You can't go around calling yourself an architect, otherwise you get slapped with a 20,000 fine.
[00:54:47] So, um, true fact. Yeah.
[00:54:49] Hamish: I wasn't just giving a shout out to homeowners then. I was actually giving a shout out to builders as well because, um, I know you guys also, you know, uh, really encouraged [00:55:00] builders sort of partnering up for that kind of DC process process too. So it was actually a shout out to. And homeowners, um, wanting to, you know, catch up with you guys.
[00:55:10] 'cause I know we've kind of explored a couple of different options and, you know, both have, you know, great outcomes in my opinion. So, you know, if you are a builder or a homeowner, you know, no matter where you are in Australia, like I'd, I'd strongly encourage you, reach out to align. What else you got, Maddie?
[00:55:27] Matthew: Um, no, I'm trying to work on my PR to repair my relationship with architects.
[00:55:34] Hamish: Sorry.
[00:55:34] Matthew: I, I did speak to Hamish about a series on, um, like honest truths and we're just gonna go very open book on. What we think builders doing wrong, architects, building surveyors, interior designers, and just, it's not from a negative place.
[00:55:48] Some will take it from a negative place. It's actually to help the industry improve and just do this whole, you are doing this wrong and you need to change this because this isn't
[00:55:55] working.
[00:55:56] Saxon: We've got, um, a bit of a joke in the office whenever someone [00:56:00] gets in a debate about some building science related question. Um, we had one in the office a few months ago, treated pine verse standup, pine batoning. I was just like, you know, Hey Sarah, send, send Maddie a message on Instagram and ask him. Just hoping that I just throw a hand grenade into Instagram and just explode the chat group.
[00:56:21] But, um,
[00:56:23] I
[00:56:23] dunno further about.
[00:56:23] Matthew: taking the piss outta the steel building industry too. They, they really buy it. They, they get so defensive and that's the best one to ask. Why, why? And they have nothing.
[00:56:33] Hamish: Hey, I've got a meeting, I've got, I've got a meeting after this and I'm about to lose my voice. So, um, it's really been great, uh, chatting
[00:56:40] Saxon and,
[00:56:40] Matthew: sexy voice on ham.
[00:56:42] Hamish: I'm actually catching up with an architect after this, so hopefully I can, um, woo them with my sexiness.
[00:56:47] Matthew: Make sure you put your turtle neck sweater on too.
[00:56:50] Saxon: yeah. Thanks guys.
[00:56:53] Matthew: Thank you
[00:56:54] Hamish: Thank. you. Cheers.